Used 2025 BMW M4 Base

Stock: SCU88386VIN: WBS13HK06SCU88386

Stock: SCU88386 VIN: WBS13HK06SCU88386

Used 2025 BMW M4 Base

Detailed Pricing
Veterans Ford Price:
$74,649
See Important Disclosures Here

Advertised prices reflect the dealer offering price and include all mandatory dealer-installed equipment and fees. Prices exclude tax, title, registration, and other government-imposed charges. Optional products and services are not included in the advertised price and are available for purchase only at the customer’s election. Any advertised discounts or Ford rebates are clearly identified and may be subject to eligibility requirements; not all customers will qualify. Vehicles are subject to prior sale. Dealer makes reasonable efforts to ensure inventory availability and pricing accuracy. Some vehicles may be located at other dealership locations and may be available for transfer, subject to prior sale, availability, and dealer approval. Images are for illustrative purposes only.

Vehicle Highlights

Located at Other Remote Locations

Views
205
Overview
SCU88386
Stock
WBS13HK06SCU88386
VIN
8,492
Miles
Coupe
Body
RWD
Drivetrain
Dravit Grey Metallic
Exterior
Kyalami Orange/Black
Interior
112.5
Wheelbase
Twin Turbo Premium Unleaded I-6 3.0 L/183
Engine
Gas
Fuel
6-Speed Manual w/OD
Transmission
2
Doors
23*
Highway MPG
16*
City MPG
Features
Apple CarPlay

Apple CarPlay

Blind Spot Monitor

Blind Spot Monitor

Bluetooth®

Bluetooth®

Brake Assist

Brake Assist

Collision Warning

Collision Warning

Cruise Control

Cruise Control

Hands-Free Liftgate

Hands-Free Liftgate

Heated Seats

Heated Seats

Heated Side Mirrors

Heated Side Mirrors

Keyless Entry

Keyless Entry

Lane Keep

Lane Keep

Leather Seats

Leather Seats

Memory Seats

Memory Seats

Navigation

Navigation

Parking Assist

Parking Assist

Power Seat

Power Seat

Power Windows

Power Windows

Push Button Starting

Push Button Starting

Rain Sensing Wipers

Rain Sensing Wipers

Rear Spoiler

Rear Spoiler

Rearview Camera

Rearview Camera

Satellite Radio

Satellite Radio

Security System

Security System

Side-Impact Air Bags

Side-Impact Air Bags

Stability Control

Stability Control

WiFi Hotspot

WiFi Hotspot

Details
Model Overview
The BMW 4-Series is available in two different body styles: coupe and convertible in both rear-wheel drive and all-wheel drive. There are two engines available in the 4-Series: 430i models are powered by a turbocharged 2.0L four-cylinder engine that makes 255 horsepower mated to an 8-speed automatic transmission.

The performance-oriented M4 gets a 3.0L twin-turbo six-cylinder with a 6-speed manual transmission that produces an impressive 473 horsepower and 406 lb-ft of torque. The M4 Competition uses the same engine mated to an 8-speed automatic transmission that's tuned to produce 503 horsepower. M4 models are rear-wheel-drive only.

The M440 is available in RWD and AWD and it's powered by a 3L turbocharged 6-cylinder engine that produces 382 horsepower.

Trim levels are all similarly equipped across the range, notable features on the 4-Series include 18-inch alloy wheels, LED headlights, heated side mirrors with a power folding function, 10-way power adjustable front seats, heated front seats, a leather-wrapped steering wheel, Bluetooth connectivity, a automatic climate control, BMW's iDrive system with a 14.9-inch display screen, cruise control and rain-sensing wipers.

The M4 comes with a few more standard items, such as an adaptive sport suspension, navigation, and a 16-speaker surround audio system.

Since the various trims feature similar equipment levels, there are several options and option packages available on the 4-Series.

Available safety equipment includes front and rear parking sensors, a lane departure warning system, blind spot warning, forward and rear collision mitigation, a pedestrian detection system, a driver attention alert and a traffic sign information system.
Model Strengths
Stylish Body
Great Handling
Sporty And Powerful Engines
Usable Back Seats
Variety Of Body Styles
Available All-wheel Drive
M4's Unmatched Performance
Model Changes
The BMW 4-series and M4 roll into 2025 with minimal changes.
Model Value
The BMW 4-Series is a stylish car that offers most of the performance and styling of a sports car without compromising much in terms of comfort or practicality. It features sleek, low styling and is available in a few different body styles, including as a convertible. Performance is brisk, but ride and comfort have been carefully balanced to provide a driving experience that is both entertaining and somewhat luxurious.

The BMW 4-Series competes with sedans and coupes such as the Audi A5, the Mercedes Benz C-Class and the Lexus IS. The top-of-the-line M4 offers blistering performance and razor-sharp handling but in a practical coupe package.
Features
Navigation
Navigation System
Connected Package Pro
16 Speakers
AM/FM radio: SiriusXM with 360L
Audio memory
harman/kardon Surround Sound System
harman/kardon Speakers
Radio data system
Radio: AM/FM Audio System
SiriusXM w/360L
Air Conditioning
Automatic temperature control
Front dual zone A/C
HVAC memory
Rear window defroster
Lumbar Support
Memory seat
Power driver seat
Power steering
Power windows
Remote keyless entry
Steering wheel mounted audio controls
Adaptive suspension
Four wheel independent suspension
Speed-sensing steering
Traction control
4-Wheel Disc Brakes
ABS brakes
Dual front impact airbags
Dual front side impact airbags
Emergency communication system: BMW Assist eCall
Front anti-roll bar
Knee airbag
Low tire pressure warning
Occupant sensing airbag
Overhead airbag
Rear anti-roll bar
Brake assist
Electronic Stability Control
Exterior Parking Camera Rear
Auto High-beam Headlights
Delay-off headlights
Fully automatic headlights
Panic alarm
Security system
Speed control
Auto-dimming door mirrors
Bumpers: body-color
Heated door mirrors
Power door mirrors
Spoiler
Turn signal indicator mirrors
Apple CarPlay & Android Auto Compatibility
Auto-dimming Rear-View mirror
BMW Assist eCall
BMW TeleServices
Carbon Fiber Trim
Compass
ConnectedDrive Services
Driver door bin
Driver vanity mirror
Front reading lights
Garage door transmitter
Illuminated entry
Leather Shift Knob
Leather steering wheel
Outside temperature display
Overhead console
Passenger vanity mirror
Personal eSIM 5G
Rear reading lights
Rear seat center armrest
Sport steering wheel
Tachometer
Telescoping steering wheel
Tilt steering wheel
Trip computer
Widescreen Display
Extended Merino Leather Upholstery
Front Bucket Seats
Front Center Armrest
Heated Front Seats
Heated front seats
M Sport Seats
Power Front Seats
Power passenger seat
Split folding rear seat
Passenger door bin
Alloy wheels
Wheels: 18 x 9.5 Fr/19 x 10.5 Rr M Dual-Spoke
Rain sensing wipers
Speed-Sensitive Wipers
Variably intermittent wipers
Traction Control
Tilt Steering
Telescopic Steering Column
Satellite Radio
Cruise Control
Bluetooth
Alloys
**Back-Up Camera**
DRAVIT GREY METALLIC
KYALAMI ORANGE/BLACK EXTENDED MERINO LEATHER UPHOLSTERY
M SPORT SEATS (STD)
WHEELS: 18 X 9.5 FR/19 X 10.5 RR M DUAL-SPOKE -inc: Style 824M Orbit grey forged (STD)
CARBON FIBER TRIM
Turbocharged
Rear Wheel Drive
Active Suspension
Power Steering
ABS
4-Wheel Disc Brakes
Brake Assist
Locking/Limited Slip Differential
Aluminum Wheels
Tires - Front Performance
Tires - Rear Performance
Heated Mirrors
Power Mirror(s)
Integrated Turn Signal Mirrors
Power Folding Mirrors
Rear Defrost
Intermittent Wipers
Variable Speed Intermittent Wipers
Rain Sensing Wipers
Rear Spoiler
Daytime Running Lights
Automatic Headlights
Headlights-Auto-Leveling
LED Headlights
Automatic Highbeams
AM/FM Stereo
MP3 Capability
Steering Wheel Audio Controls
Auxiliary Audio Input
HD Radio
Satellite Radio
Requires Subscription
Premium Sound System
Bluetooth Connection
Bucket Seats
Power Driver Seat
Power Passenger Seat
Heated Front Seat(s)
Pass-Through Rear Seat
Rear Bench Seat
Adjustable Steering Wheel
Trip Computer
Leather Steering Wheel
Keyless Entry
Power Door Locks
Keyless Start
Keyless Entry
Power Door Locks
Hands-Free Liftgate
Universal Garage Door Opener
Cruise Control
Climate Control
Multi-Zone A/C
A/C
Leather Seats
Auto-Dimming Rearview Mirror
Driver Vanity Mirror
Passenger Vanity Mirror
Driver Illuminated Vanity Mirror
Passenger Illuminated Visor Mirror
Floor Mats
Mirror Memory
Seat Memory
Keyless Start
Smart Device Integration
Telematics
Requires Subscription
WiFi Hotspot
WiFi Hotspot
WiFi Hotspot
Navigation System
Smart Device Integration
Power Windows
Power Door Locks
Trip Computer
Driver Adjustable Lumbar
Passenger Adjustable Lumbar
Security System
Immobilizer
Traction Control
Stability Control
Traction Control
Front Side Air Bag
Rear Parking Aid
Blind Spot Monitor
Cross-Traffic Alert
Lane Departure Warning
Lane Keeping Assist
Lane Departure Warning
Front Collision Mitigation
Driver Monitoring
Tire Pressure Monitor
Driver Air Bag
Passenger Air Bag
Front Head Air Bag
Rear Head Air Bag
Passenger Air Bag Sensor
Knee Air Bag
Back-Up Camera
Mechanical
Engine: 3.0L 6-Cylinder TwinPower Turbo
Transmission: 6-Speed Manual
Engine Auto Stop-Start Feature
Transmission w/Driver Selectable Mode
Rear-Wheel Drive
3.46 Axle Ratio
Engine Oil Cooler
Battery w/Run Down Protection
Regenerative Alternator
Gas-Pressurized Shock Absorbers
Front And Rear Anti-Roll Bars
Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
Electric Power-Assist Speed-Sensing Steering
15.6 Gal. Fuel Tank
Dual Stainless Steel Exhaust w/Chrome Tailpipe Finisher
Strut Front Suspension w/Coil Springs
Multi-Link Rear Suspension w/Coil Springs
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
Electro-Mechanical Limited Slip Differential
Exterior
Tire Mobility Kit
Body-Colored Front Bumper
Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
Rocker Panel Extensions
Black Side Windows Trim and Black Front Windshield Trim
Body-Colored Door Handles
Body-Colored Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
Fixed Rear Window w/Defroster
Light Tinted Glass
Speed Sensitive Rain Detecting Variable Intermittent Wipers
Galvanized Steel/Aluminum/Composite Panels
Black Grille
Front License Plate Bracket
Trunk Rear Cargo Access
Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Directionally Adaptive Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
Cornering Lights
Perimeter/Approach Lights
LED Brakelights
Headlights-Automatic Highbeams
Entertainment
Radio: AM/FM Audio System
16 Speakers
600w Premium Amplifier
Streaming Audio
Integrated Roof Antenna
harman/kardon Surround Sound System
Bluetooth Wireless Phone Connectivity
2 LCD Monitors In The Front
Artti Real-Time Traffic Display
Interior
12-Way Driver Seat -inc: Manual Cushion Extension and Power Rear Seat Easy Entry
12-Way Passenger Seat -inc: Manual Cushion Extension and Power Rear Seat Easy Entry
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Manual Tilt/Telescoping Steering Column
Fixed Rear Windows
M Sport Sport Leather Steering Wheel
Front Cupholder
Rear Cupholder
Compass
Valet Function
Power Fuel Flap Locking Type
Remote Releases -Inc: Comfort Access Proximity Cargo Access
Garage Door Transmitter
Cruise Control w/Steering Wheel Controls
Voice Activated Dual Zone Front Automatic Air Conditioning
HVAC -inc: Underseat Ducts and Console Ducts
Illuminated Locking Glove Box
Driver Foot Rest
Interior Trim -inc: Aluminum Instrument Panel Insert and Piano Black/Metal-Look Interior Accents
Full Cloth Headliner
Leatherette Door Trim Insert
Leather/Metal-Look Gear Shifter Material
Day-Night Auto-Dimming Rearview Mirror
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination, Driver And Passenger Auxiliary Mirror
Full Floor Console w/Covered Storage, Mini Overhead Console and 3 12V DC Power Outlets
Front And Rear Map Lights
Fade-To-Off Interior Lighting
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
Cargo Area Concealed Storage
Cargo Features -inc: Tire Mobility Kit
Cargo Space Lights
Memory Settings -inc: Driver Seat, Door Mirrors, Audio and HVAC
Tracker System
Widescreen Display
Instrument Panel Covered Bin, Driver And Passenger Door Bins
Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
Delayed Accessory Power
Driver Information Center
Redundant Digital Speedometer
Outside Temp Gauge
Digital Appearance
BMW TeleServices
Manual Adjustable Front Head Restraints and Fixed Rear Head Restraints
Front Center Armrest and Rear Center Armrest
Perimeter Alarm
Immobilizer
3 12V DC Power Outlets
Air Filtration
Safety
Side Impact Beams
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Active Blind Spot Detection Blind Spot
Frontal Collision Warning
Rear Collision Prevention
Collision Mitigation-Front
Driver Monitoring-Alert
Tire Specific Low Tire Pressure Warning
Dual Stage Driver And Passenger Front Airbags
Curtain 1st And 2nd Row Airbags
Airbag Occupancy Sensor
Driver And Passenger Knee Airbag
Outboard Front Lap And Shoulder Safety Belts -inc: Pretensioners
Back-Up Camera
Options
DRAVIT GREY METALLIC
- $1,500
KYALAMI ORANGE/BLACK, EXTENDED MERINO LEATHER UPHOLSTERY
M SPORT SEATS
WHEELS: 18" X 9.5" FR/19" X 10.5" RR M DUAL-SPOKE
  • Style 824M
  • Orbit Grey Forged
  • CARBON FIBER TRIM
    - $950
    Similar Vehicles

    2023 BMW M4 Base

    Stock: PCM44007

    Quick View

    2020 BMW X5 xDrive40i

    Stock: L9B96500

    Quick View

    2018 BMW 7 Series 750i

    Stock: JGM23966

    Quick View

    2023 BMW X5 xDrive45e

    Stock: P9P61255

    Quick View

    Dealer FAQs

    Can I get financed for an auto loan at Veterans Ford?

    Getting financed with us is fast and fun. Whether you’ve always enjoyed a sterling credit history, are currently working on improving your credit score even more, or this is your first time buying a car, you can count on the friendly experts at Veterans Ford to make the whole process transparent and easy to understand. To learn more and get the ball rolling on the right loan for your unique financial situation, call 813-845-8796 or apply online now. 

    What is the financing process like at Veterans Ford?

    Easy and relaxed. Our primary goal is your total satisfaction, so we provide you with as much time and expert insight as you need to properly consider all of your loan options. This commitment to friendly, honest, and fair service is truly a breath of fresh air and ensures that you drive away happy, satisfied, and behind the wheel of the vehicle you've always wanted.

    What are the steps in the financing process at Veterans Ford?

    Great question. Securing a competitive loan from Veterans Ford takes only three easy steps. First up is to either apply online for pre-approval via our quick and convenient online credit application or call 813-845-8796. From here, one of our financing experts will connect with you to go over the details of your loan offers and ensure that you have everything you need to make a smart and informed decision.

    After reviewing your proposed loan terms and consulting with our financial advisors and your trusted personal confidants (friends, family members, etc.), there is only one step left: Finalizing the perfect loan for you via a simple and respectful process. By following these three short steps, you can make the most of the best loan experience here in Tampa.

    What is involved in securing an auto loan in Tampa FL?

    The answer to this question includes a variety of factors, such as:

    • Your car's purchase price
    • Your trade in and equity position
    • If the vehicle you are purchasing is new or used
    • The length of your existing loan's life
    • Your current credit score
    • How much you are choosing to invest in a down payment

    People from all around Tampa come to purchase a clean car, truck, or SUV from our used car lot each and every day. Most loans prepared by our team are entirely unique, so the factors that will shape your bank loan will depend on your specific situation, desires, and needs.

    Our expert financial professionals are happy to find and present lots of great offers to ensure that you are in complete control and that you are receiving the best deal possible on the loan you need. Our customers make great and informed decisions based on all of their available options thanks to a perfectly transparent process that we take seriously.

    Who can I call at Veterans Ford to get the financing process started?

    Any of our amazing specialists will be more than happy to help you get the ball rolling on your dream car. All you have to do is dial 813-845-8796 when you have a few free moments and you'll soon see that getting approved for a car loan at Veterans Ford is quick, easy, and convenient.

    Advertised prices reflect the dealer offering price and include all mandatory dealer-installed equipment and fees. Prices exclude tax, title, registration, and other government-imposed charges. Optional products and services are not included in the advertised price and are available for purchase only at the customer’s election. Any advertised discounts or Ford rebates are clearly identified and may be subject to eligibility requirements; not all customers will qualify. Vehicles are subject to prior sale. Dealer makes reasonable efforts to ensure inventory availability and pricing accuracy. Some vehicles may be located at other dealership locations and may be available for transfer, subject to prior sale, availability, and dealer approval. Images are for illustrative purposes only.

    © 2026 Veterans Ford
    Click to See All Photos